Project Structures: Hotel building (4 stars, 36.700m2), cableway main building (16.700m2), workshop building (2.500m2), personnel housing (6.000m2), CHPP building (united heat & electrical facility 5.400m2), chiller room (550m2), 5 cableway terminals (2.000m2). Project Special Features: It poses as the first tourism complex equipped with skiing facilities in the history for Azerbaijan and the construction has been realized at an altitude of 2,200m. In the project, equipped with 4 Main and 4 auxiliary pistes, the total length of the pistes reaches 3 kilometers and covers an area of 40 hectares. 54 snow machines in total are serving all pistes.
Our other projects